{"id":3739,"date":"2026-10-19T19:23:31","date_gmt":"2026-10-19T23:23:31","guid":{"rendered":"https:\/\/genispec.com\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/"},"modified":"2026-10-19T19:25:28","modified_gmt":"2026-10-19T23:25:28","slug":"how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec","status":"publish","type":"post","link":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/","title":{"rendered":"How to prioritize facade repairs after a building inspection in Quebec ?"},"content":{"rendered":"[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; custom_padding=&#8221;0px||4px|||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; custom_margin=&#8221;|auto||auto|false|false&#8221; custom_padding=&#8221;10px|||||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.24.3&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; custom_margin=&#8221;||15px||false|false&#8221; custom_padding=&#8221;15px||||false|false&#8221; global_colors_info=&#8221;{}&#8221;]\n<p><span style=\"font-weight: 400\">In Quebec, <\/span><a href=\"https:\/\/genispec.com\/en\/building-inspection\/bill-122\/\"><span style=\"font-weight: 400\">Bill 122<\/span><\/a><span style=\"font-weight: 400\"> requires periodic <\/span><a href=\"https:\/\/genispec.com\/en\/building-inspection\/facade\/\"><span style=\"font-weight: 400\">facade inspections<\/span><\/a><span style=\"font-weight: 400\"> for buildings with at least one facade that is five floors or more above ground level. Every five years, an engineer or architect must prepare a report detailing the observed defects, recommended corrective actions, and timelines for action. The report is not just a simple list of defects. It helps determine what needs to be secured immediately, repaired in the short term, monitored, or included in the next budget.<\/span><\/p>\n<p><\/p>\n<p><span style=\"font-weight: 400\">To prioritize facade repairs, start with conditions that threaten the safety of occupants and the public. Then rank the remaining repairs according to the timeline recommended by the professional, the risk of deterioration, and the consequences of delaying the work. The cost of the work should never be the primary factor in decision-making. <\/span><\/p>\n[\/et_pb_text][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; background_color=&#8221;rgba(3,110,140,0.06)&#8221; custom_margin=&#8221;5px|5px|5px|5px|true|true&#8221; custom_padding=&#8221;10px|5px|10px|5px|true|true&#8221; border_radii=&#8221;on|5px|5px|5px|5px&#8221; border_width_all=&#8221;2px&#8221; border_color_all=&#8221;#036e8c&#8221; box_shadow_style=&#8221;preset1&#8243; global_colors_info=&#8221;{}&#8221;]\n<p style=\"text-align: center;font-size: 1.5em\"><strong>Key Points &#8211; What to Remember :<\/strong><\/p>\n<p><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">An unsafe condition requires immediate safety measures.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The timeframe indicated in the report is just as important as the nature of the defect.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The risk of the condition deteriorating must be assessed before postponing a repair.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The inspection report provides guidance on the work to be performed, but does not always replace the <\/span><a href=\"https:\/\/genispec.com\/en\/structural-engineering\/construction-plans-specifications\/\"><span style=\"font-weight: 400\">construction plans and specifications<\/span><\/a><span style=\"font-weight: 400\"> needed to carry it out.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Postponed major repairs must be recorded in the <\/span><a href=\"https:\/\/genispec.com\/en\/building-expert\/building-maintenance-handbook-for-condominiums\/\"><span style=\"font-weight: 400\">building maintenance handbook<\/span><\/a><span style=\"font-weight: 400\"> and included in the condominium\u2019s long-term budget.\u00a0<\/span><\/li>\n<\/ul>\n[\/et_pb_text][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_button button_url=&#8221;https:\/\/genispec.com\/en\/contact\/#form&#8221; button_text=&#8221;Let Genispec help you determine the priorities for your facade repairs&#8221; button_alignment=&#8221;center&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; custom_button=&#8221;on&#8221; button_text_size=&#8221;16px&#8221; button_text_color=&#8221;#FFFFFF&#8221; button_bg_color=&#8221;#036e8c&#8221; button_icon=&#8221;&#x35;||divi||400&#8243; button_icon_color=&#8221;#FFFFFF&#8221; button_on_hover=&#8221;off&#8221; background_layout=&#8221;dark&#8221; custom_margin=&#8221;|100px||100px|false|false&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_button][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; custom_margin=&#8221;||15px||false|false&#8221; custom_padding=&#8221;15px||||false|false&#8221; global_colors_info=&#8221;{}&#8221;]\n<h2><b>Why have the facades of your building inspected ?<\/b><\/h2>\n<p><\/p>\n<p><span style=\"font-weight: 400\">Facade inspections are mandatory for buildings covered by Bill 122. They help identify components that may come loose and less visible signs of deterioration.<\/span><\/p>\n<p><\/p>\n<p><span style=\"font-weight: 400\">Following the inspection, the professional provides a report detailing the observed issues, recommended corrective actions, and deadlines for completion. This allows the condominium association to plan facade repairs in the proper order, prevent further damage, and allocate the necessary budget.\u00a0<\/span><\/p>\n<p><\/p>\n<p>&nbsp;<\/p>\n<p><\/p>\n<h2><b>What should you read first in a facade inspection report in Quebec ?<\/b><\/h2>\n<p><\/p>\n<p><span style=\"font-weight: 400\">When you receive the facade inspection report, start by reading the summary, recommendations, and timelines to determine what needs to be addressed immediately and what can be planned for later. Then review the photos and elevation drawings to locate each defect.<\/span><\/p>\n<p><\/p>\n<p><span style=\"font-weight: 400\">Under the requirements of Bill 122, Section 384 of the <\/span><a href=\"https:\/\/www.legisquebec.gouv.qc.ca\/en\/pdf\/cr\/B-1.1,%20R.%203.pdf\"><span style=\"font-weight: 400\">Quebec Safety Code<\/span><\/a><span style=\"font-weight: 400\"> mandates that the report specify the work to be performed and the recommended timeline. The photos and elevation drawings, when provided, then allow you to pinpoint each defect.\u00a0<\/span><\/p>\n<p><\/p>\n<h3><b>How should the deadlines recommended by the engineer be interpreted ?<\/b><\/h3>\n<p><\/p>\n<p><span style=\"font-weight: 400\">When included in the report, the terms \u00ab immediate \u00bb, \u00ab short-term \u00bb et \u00ab to be monitored \u00bb help clarify the risk identified during the facade inspection. The deadline for facade repairs must be met, even if the defect appears stable.<\/span><\/p>\n<p><\/p>\n<p><b>For each observation, even minor ones, record :<\/b><\/p>\n<p><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Its exact location<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The defect and its probable cause<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The recommended measures<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The deadline for action<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The person responsible for follow-up<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The status of the case<\/span><\/li>\n<\/ul>\n<p><\/p>\n<p><span style=\"font-weight: 400\">If you are unable to prioritize among several repairs, ask the engineer to explain their recommendations. Two similar cracks may have very different causes, risk levels, and consequences.<\/span><\/p>\n<p><\/p>\n<h3><b>What factors should be considered before prioritizing repairs ?<\/b><\/h3>\n<p><\/p>\n<p><span style=\"font-weight: 400\">The size of the defect alone is not enough to determine its urgency. You must also consider its height, location, progression, exposure to the elements, and the amount of foot traffic in the area below it.<\/span><\/p>\n<p><\/p>\n<p><b>Factors to examine include :<\/b><\/p>\n<p><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Masonry and cladding : loose bricks or stones, deteriorated mortar, cracks, deformation, bulging, etc.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Openings and waterproofing : sealant joints, sills, flashings, signs of water infiltration around windows, etc.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Elements attached to the facade : balconies, railings, awnings, light fixtures, etc.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Hidden elements : cladding anchors, lintels, and metal components susceptible to corrosion.<\/span><\/li>\n<\/ul>\n<p><\/p>\n<p><span style=\"font-weight: 400\">However, some problems remain invisible without a close inspection or exploratory opening. A professional\u2019s assessment must therefore always take precedence over an observation made from the ground.\u00a0<\/span><\/p>\n<p><\/p>\n<p>&nbsp;<\/p>\n<p><\/p>\n<h2><b>How should a building\u2019s facade repairs be prioritized ?<\/b><\/h2>\n<p><\/p>\n<p><span style=\"font-weight: 400\">To prioritize facade repairs in Quebec, classify the work according to four criteria: danger to the public, the deadline specified in the report, the risk of deterioration, and maintenance needs.<\/span><\/p>\n[\/et_pb_text][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; custom_margin=&#8221;||15px||false|false&#8221; custom_padding=&#8221;15px||||false|false&#8221; global_colors_info=&#8221;{}&#8221;]\n<div style=\"width: 100%;max-width: 100%;margin: 0;padding: 0\">\n<table style=\"width: 100%;max-width: 100%;border-collapse: collapse;border: 1px solid #000000;margin: 0\" border=\"1\" cellpadding=\"5\">\n<tbody>\n<tr style=\"height: 55px\">\n<td style=\"width: 27%;padding: 5px;background-color: #204e62;color: #ffffff;border: 1px solid #000000;text-align: center;vertical-align: middle\"><strong>Priority Level<\/strong><\/td>\n<td style=\"width: 36%;padding: 5px;background-color: #204e62;color: #ffffff;border: 1px solid #000000;text-align: center;vertical-align: middle\"><strong>Action Required<\/strong><\/td>\n<td style=\"width: 37%;padding: 5px;background-color: #204e62;color: #ffffff;border: 1px solid #000000;text-align: center;vertical-align: middle\"><strong>Examples<\/strong><\/td>\n<\/tr>\n<tr style=\"height: 80px\">\n<td style=\"padding: 5px;background-color: #d8625d;color: #000000;border: 1px solid #000000;text-align: center;vertical-align: middle\"><strong>Imminent Danger<\/strong><\/td>\n<td style=\"padding: 5px;background-color: #ffffff;color: #000000;border: 1px solid #000000;text-align: center;vertical-align: middle\">Secure the area and take immediate action<\/td>\n<td style=\"padding: 5px;background-color: #ffffff;color: #000000;border: 1px solid #000000;text-align: center;vertical-align: middle\">Unstable structure, risk of collapse, concerning bulging<\/td>\n<\/tr>\n<tr style=\"height: 80px\">\n<td style=\"padding: 5px;background-color: #f09997;color: #000000;border: 1px solid #000000;text-align: center;vertical-align: middle\"><strong>Priority Repair<\/strong><\/td>\n<td style=\"padding: 5px;background-color: #ffffff;color: #000000;border: 1px solid #000000;text-align: center;vertical-align: middle\">Quickly address the cause and minimize damage<\/td>\n<td style=\"padding: 5px;background-color: #ffffff;color: #000000;border: 1px solid #000000;text-align: center;vertical-align: middle\">Water infiltration, corrosion, movement, open joint<\/td>\n<\/tr>\n<tr style=\"height: 80px\">\n<td style=\"padding: 5px;background-color: #f7cdcc;color: #000000;border: 1px solid #000000;text-align: center;vertical-align: middle\"><strong>Scheduled Repair<\/strong><\/td>\n<td style=\"padding: 5px;background-color: #ffffff;color: #000000;border: 1px solid #000000;text-align: center;vertical-align: middle\">Adhere to the report\u2019s deadline<\/td>\n<td style=\"padding: 5px;background-color: #ffffff;color: #000000;border: 1px solid #000000;text-align: center;vertical-align: middle\">Stable cracked masonry, anchors or sealant need to be replaced<\/td>\n<\/tr>\n<tr style=\"height: 80px\">\n<td style=\"padding: 5px;background-color: #fcedec;color: #000000;border: 1px solid #000000;text-align: center;vertical-align: middle\"><strong>Preventive Maintenance<\/strong><\/td>\n<td style=\"padding: 5px;background-color: #ffffff;color: #000000;border: 1px solid #000000;text-align: center;vertical-align: middle\">Add to the maintenance schedule and monitor<\/td>\n<td style=\"padding: 5px;background-color: #ffffff;color: #000000;border: 1px solid #000000;text-align: center;vertical-align: middle\">Cleaning, spot repointing, periodic inspection<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n[\/et_pb_text][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_testimonial author=&#8221;Yossi Elmaleh&#8221; job_title=&#8221;Engineer at Genispec &#8221; portrait_url=&#8221;https:\/\/genispec.com\/wp-content\/uploads\/2018\/05\/genispec-icon.png&#8221; quote_icon_color=&#8221;#036e8c&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]\n<p><span style=\"font-weight: 400\">\u00ab Often, problems are hidden. There are missing or misplaced anchors, or elements specified in the plans that are not visible or are poorly constructed. \u00bb<\/span><\/p>\n[\/et_pb_testimonial][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; custom_margin=&#8221;||15px||false|false&#8221; custom_padding=&#8221;15px||||false|false&#8221; global_colors_info=&#8221;{}&#8221;]\n<h3><b>Why does an unsafe condition change the work priorities ?<\/b><\/h3>\n<p><\/p>\n<p><span style=\"font-weight: 400\">An unsafe condition means that a component could come loose, collapse, or injure someone. In this situation, <\/span><b>the priority is to secure the site<\/b><span style=\"font-weight: 400\">. The professional notifies the owner and the RBQ, then specifies the temporary emergency measures.<\/span><\/p>\n<p><\/p>\n<p><b>What needs to be implemented :\u00a0<\/b><\/p>\n<p><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">A safety perimeter.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Removal of unstable elements.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Safety nets.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Shoring or scaffolding.<\/span><\/li>\n<\/ul>\n[\/et_pb_text][et_pb_testimonial author=&#8221;Yossi Elmaleh&#8221; job_title=&#8221;Engineer at Genispec &#8221; portrait_url=&#8221;https:\/\/genispec.com\/wp-content\/uploads\/2018\/05\/genispec-icon.png&#8221; quote_icon_color=&#8221;#036e8c&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]\n<p><span style=\"font-weight: 400\">\u00ab It\u2019s important to maintain facades precisely to prevent physical harm to the public. \u00bb<\/span><\/p>\n[\/et_pb_testimonial][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; custom_margin=&#8221;||15px||false|false&#8221; custom_padding=&#8221;15px||||false|false&#8221; global_colors_info=&#8221;{}&#8221;]\n<h3><b>Why is it necessary to address the cause before the visible defect appears ?<\/b><\/h3>\n<p><\/p>\n<p><span style=\"font-weight: 400\">To prioritize a repair, <\/span><b>you must understand what caused it<\/b><span style=\"font-weight: 400\">. A surface-level repair alone may temporarily mask the problem without preventing it from recurring.<\/span><\/p>\n<p><\/p>\n<p><b><i>For example : <\/i><\/b><i><span style=\"font-weight: 400\">Cracked bricks beneath a parapet may be a sign of water infiltration. Before replacing them, you must fix the defective flashing and check the anchors behind the cladding. Otherwise, the new bricks may deteriorate as well.<\/span><\/i><\/p>\n<p><\/p>\n<p>&nbsp;<\/p>\n<p><\/p>\n<h2><b>How can work be consolidated without delaying an urgent repair ?<\/b><\/h2>\n<p><\/p>\n<p><span style=\"font-weight: 400\">Work following a facade inspection can sometimes be consolidated to reduce mobilization, aerial work platform, or scaffolding costs. This approach works if the work involves the same area and meets all the deadlines specified in the report.<\/span><\/p>\n<p><\/p>\n<h3><b>What types of work can be combined on the same facade ?<\/b><\/h3>\n<p><\/p>\n<p><span style=\"font-weight: 400\">Re-grouting, sealant replacement, and certain masonry repairs in a condominium can be coordinated on the same facade. However, combining work is no longer advantageous if it delays a safety measure or allows an active water leak to continue.\u00a0<\/span><\/p>\n<p><\/p>\n<h3><b>When should facade work be carried out separately ?<\/b><\/h3>\n<p><\/p>\n<p><span style=\"font-weight: 400\">Urgent facade repairs must be carried out without waiting for a larger project or combining them with other work. You should also carry out repairs separately when water infiltration continues to damage the wall or when a temporary repair risks masking the progression of the defect.<\/span><\/p>\n<p><\/p>\n<h2><b>Should facade plans and specifications be prepared in addition to the inspection report ?<\/b><\/h2>\n<p><\/p>\n<p><span style=\"font-weight: 400\">However, the inspection report does not always specify the materials, quantities, and technical details needed to obtain comparable bids. For a major repair involving multiple components, plans and specifications allow each contractor <\/span><b>to estimate the same scope of work<\/b><span style=\"font-weight: 400\">, which reduces the risk of differing interpretations or unforeseen issues on the same job site.<\/span><\/p>\n[\/et_pb_text][et_pb_testimonial author=&#8221;Yossi Elmaleh&#8221; job_title=&#8221;Engineer at Genispec &#8221; portrait_url=&#8221;https:\/\/genispec.com\/wp-content\/uploads\/2018\/05\/genispec-icon.png&#8221; quote_icon_color=&#8221;#036e8c&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;]\n<p><span style=\"font-weight: 400\">\u00ab The inspection is not considered a set of plans and specifications as such. Genispec provides recommendations and timelines based on the issues identified. \u00bb<\/span><\/p>\n[\/et_pb_testimonial][et_pb_text _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; custom_margin=&#8221;||15px||false|false&#8221; custom_padding=&#8221;15px||||false|false&#8221; global_colors_info=&#8221;{}&#8221;]\n<p><span style=\"font-weight: 400\">Before requesting quotes, confirm with the professional whether plans and estimates are required. Also check with the municipality to see if the work requires a permit or must comply with specific regulations.<\/span><\/p>\n<p><\/p>\n<p>&nbsp;<\/p>\n<p><\/p>\n<h2><b>How should facade repairs be included in the condominium budget ?<\/b><\/h2>\n<p><\/p>\n<p><b>The facade repair budget must include :\u00a0<\/b><\/p>\n<p><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Immediate and temporary safety measures.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Short- and medium-term work.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Professional fees.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Plans and cost estimates.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Costs for access, permits, and testing.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">A contingency fund for unforeseen expenses.<\/span><\/li>\n<\/ul>\n<p><\/p>\n<p><span style=\"font-weight: 400\">For a condominium association, these amounts must then be incorporated into the financial plan, in line with the maintenance log. This allows the board of directors to compare available cash, projected dues, and technical deadlines rather than treating each repair as an unexpected expense.\u00a0<\/span><\/p>\n<p><\/p>\n<p>&nbsp;<\/p>\n<p><\/p>\n<h2><b>How to choose the right contractor for your condominium\u2019s exterior repairs ?<\/b><\/h2>\n<p><\/p>\n<p><span style=\"font-weight: 400\">The lowest quote isn\u2019t necessarily the best option for your condominium. To prioritize facade repairs and evaluate contractors fairly, the board of directors must first ensure that each bid is based on the same scope of work and the same technical requirements. It can then compare the contractors\u2019 experience with facade repairs, their work methods, their timelines, their warranties, their insurance, and their references.<\/span><\/p>\n<p><\/p>\n<p><span style=\"font-weight: 400\">Has your report just been delivered, but you\u2019re having trouble deciding between the bids submitted ? Genispec can help you establish a clear work plan, prepare precise technical documents, and obtain comparable quotes throughout the province of Quebec.<\/span><\/p>\n[\/et_pb_text][et_pb_button button_url=&#8221;https:\/\/genispec.com\/en\/contact\/#form&#8221; button_text=&#8221;Request assistance with your facade work from Genispec&#8221; button_alignment=&#8221;center&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; custom_button=&#8221;on&#8221; button_text_size=&#8221;16px&#8221; button_text_color=&#8221;#FFFFFF&#8221; button_bg_color=&#8221;#036e8c&#8221; button_icon=&#8221;&#x35;||divi||400&#8243; button_icon_color=&#8221;#FFFFFF&#8221; button_on_hover=&#8221;off&#8221; background_layout=&#8221;dark&#8221; custom_margin=&#8221;|100px||100px|false|false&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_button][et_pb_divider show_divider=&#8221;off&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.24.3&#8243; _module_preset=&#8221;default&#8221; custom_padding=&#8221;0px||0px|||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row _builder_version=&#8221;4.24.3&#8243; _module_preset=&#8221;default&#8221; custom_margin=&#8221;-29px|auto||auto||&#8221; custom_padding=&#8221;||1px|||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.24.3&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_divider color=&#8221;#036e8c&#8221; _builder_version=&#8221;4.24.3&#8243; _module_preset=&#8221;default&#8221; custom_margin=&#8221;||-21px|||&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_team_member name=&#8221;Genispec&#8221; position=&#8221;Consulting engineering firm based in Qu\u00e9bec&#8221; facebook_url=&#8221;https:\/\/www.facebook.com\/Genispec\/&#8221; linkedin_url=&#8221;https:\/\/www.linkedin.com\/company\/genispec-inspections-inc\/&#8221; icon_color=&#8221;#036e8c&#8221; use_icon_font_size=&#8221;on&#8221; icon_font_size=&#8221;20px&#8221; _builder_version=&#8221;4.27.4&#8243; _module_preset=&#8221;default&#8221; header_level=&#8221;h3&#8243; header_font_size=&#8221;18px&#8221; position_font=&#8221;|600|||||||&#8221; width=&#8221;100%&#8221; module_alignment=&#8221;center&#8221; min_height=&#8221;280px&#8221; custom_padding=&#8221;15px|0px|0px|||&#8221; border_style_all_image=&#8221;none&#8221; global_colors_info=&#8221;{}&#8221;]\n<p>Genispec is a consulting engineering firm made up of building engineers who are members of the OIQ. We offer specialized services in fa\u00e7ade and underground parking inspections in accordance with Law 122, as well as reserve fund studies and maintenance logs as required by Law 16. We also conduct inspections of commercial, multi-residential, industrial buildings, and condominiums. In addition, we provide building condition certificates and pre-delivery inspections.<\/p>\n<p><\/p>\n<div>\n<p>All our reports are validated by a qualified engineer. Every article published on our website is reviewed and approved by a qualified member of our team to ensure the technical accuracy of the information.<\/p>\n<\/div>\n[\/et_pb_team_member][\/et_pb_column][\/et_pb_row][\/et_pb_section]\n","protected":false},"excerpt":{"rendered":"<p>In Quebec, Bill 122 requires periodic facade inspections for buildings with at least one facade that is five floors or more above ground level. Every five years, an engineer or architect must prepare a report detailing the observed defects, recommended corrective actions, and timelines for action. The report is not just a simple list of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2838,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[51,16],"tags":[],"class_list":["post-3739","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-facade","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Prioritizing building facade repairs in Quebec - Our Guide | Genispec<\/title>\n<meta name=\"description\" content=\"Learn how to prioritize exterior facade repairs following an inspection in accordance with Bill 122 : emergencies, timelines, quotes, and the condominium budget.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Prioritizing building facade repairs in Quebec - Our Guide | Genispec\" \/>\n<meta property=\"og:description\" content=\"Learn how to prioritize exterior facade repairs following an inspection in accordance with Bill 122 : emergencies, timelines, quotes, and the condominium budget.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/\" \/>\n<meta property=\"og:site_name\" content=\"Genispec\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Genispec\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-19T23:23:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T23:25:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/genispec.com\/wp-content\/uploads\/2024\/02\/Inspection-de-batiment-commercial-ou-industriel-5.png\" \/>\n\t<meta property=\"og:image:width\" content=\"407\" \/>\n\t<meta property=\"og:image:height\" content=\"305\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"genispec\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"genispec\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\\\/\"},\"author\":{\"name\":\"genispec\",\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/#\\\/schema\\\/person\\\/f940a395f00fe18856d620346ba7f319\"},\"headline\":\"How to prioritize facade repairs after a building inspection in Quebec ?\",\"datePublished\":\"2026-10-19T23:23:31+00:00\",\"dateModified\":\"2026-10-19T23:25:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\\\/\"},\"wordCount\":2222,\"publisher\":{\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/genispec.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Inspection-de-batiment-commercial-ou-industriel-5.png\",\"articleSection\":[\"Facade\",\"News\"],\"inLanguage\":\"en-CA\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\\\/\",\"url\":\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\\\/\",\"name\":\"Prioritizing building facade repairs in Quebec - Our Guide | Genispec\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/genispec.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Inspection-de-batiment-commercial-ou-industriel-5.png\",\"datePublished\":\"2026-10-19T23:23:31+00:00\",\"dateModified\":\"2026-10-19T23:25:28+00:00\",\"description\":\"Learn how to prioritize exterior facade repairs following an inspection in accordance with Bill 122 : emergencies, timelines, quotes, and the condominium budget.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\\\/#breadcrumb\"},\"inLanguage\":\"en-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\\\/#primaryimage\",\"url\":\"https:\\\/\\\/genispec.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Inspection-de-batiment-commercial-ou-industriel-5.png\",\"contentUrl\":\"https:\\\/\\\/genispec.com\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Inspection-de-batiment-commercial-ou-industriel-5.png\",\"width\":407,\"height\":305,\"caption\":\"Commercial building inspection in downtown Montreal building\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/genispec.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to prioritize facade repairs after a building inspection in Quebec ?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/genispec.com\\\/en\\\/\",\"name\":\"Genispec\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/genispec.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/#organization\",\"name\":\"Genispec\",\"url\":\"https:\\\/\\\/genispec.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/genispec.com\\\/wp-content\\\/uploads\\\/2018\\\/03\\\/optimized_with_description_FRENCH-e1522356210161.jpg\",\"contentUrl\":\"https:\\\/\\\/genispec.com\\\/wp-content\\\/uploads\\\/2018\\\/03\\\/optimized_with_description_FRENCH-e1522356210161.jpg\",\"width\":225,\"height\":106,\"caption\":\"Genispec\"},\"image\":{\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Genispec\\\/\",\"https:\\\/\\\/www.instagram.com\\\/genispec\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/genispec-inspections-inc-971b7018\\\/\",\"https:\\\/\\\/www.pagesjaunes.ca\\\/bus\\\/Quebec\\\/MONTREAL\\\/Genispec-Inspections-Inc\\\/100838448.html\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UC6V4DJsUvAGGOMjMfVG68LQ\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/genispec.com\\\/en\\\/#\\\/schema\\\/person\\\/f940a395f00fe18856d620346ba7f319\",\"name\":\"genispec\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-CA\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1246b52c179a3ee68d8491399f0c16985d81e2d247eb725dfb5d46a1000e328f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1246b52c179a3ee68d8491399f0c16985d81e2d247eb725dfb5d46a1000e328f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1246b52c179a3ee68d8491399f0c16985d81e2d247eb725dfb5d46a1000e328f?s=96&d=mm&r=g\",\"caption\":\"genispec\"},\"description\":\"Genispec est une firme de g\u00e9nie-conseil compos\u00e9e d\u2019ing\u00e9nieurs en b\u00e2timent membres de l\u2019OIQ. Nous offrons des services sp\u00e9cialis\u00e9s en inspection des fa\u00e7ades et stationnements souterrains selon la Loi 122, en \u00e9tude de fonds de pr\u00e9voyance et carnet d\u2019entretien selon la Loi 16, ainsi qu\u2019en inspection de b\u00e2timents commerciaux, multi-logements, industriels et copropri\u00e9t\u00e9s. Nous r\u00e9alisons aussi des certificats d\u2019\u00e9tat d\u2019immeuble et des inspections de pr\u00e9-r\u00e9ception. Tous nos rapports sont valid\u00e9s par un ing\u00e9nieur qualifi\u00e9. Tous les articles publi\u00e9s sur notre site sont r\u00e9vis\u00e9s et approuv\u00e9s par un membre qualifi\u00e9 de notre \u00e9quipe, afin de garantir l\u2019exactitude technique de l\u2019information.\",\"sameAs\":[\"https:\\\/\\\/genispec.com\"],\"url\":\"https:\\\/\\\/genispec.com\\\/en\\\/blog\\\/author\\\/genispec\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Prioritizing building facade repairs in Quebec - Our Guide | Genispec","description":"Learn how to prioritize exterior facade repairs following an inspection in accordance with Bill 122 : emergencies, timelines, quotes, and the condominium budget.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/","og_locale":"en_US","og_type":"article","og_title":"Prioritizing building facade repairs in Quebec - Our Guide | Genispec","og_description":"Learn how to prioritize exterior facade repairs following an inspection in accordance with Bill 122 : emergencies, timelines, quotes, and the condominium budget.","og_url":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/","og_site_name":"Genispec","article_publisher":"https:\/\/www.facebook.com\/Genispec\/","article_published_time":"2026-10-19T23:23:31+00:00","article_modified_time":"2026-10-19T23:25:28+00:00","og_image":[{"width":407,"height":305,"url":"https:\/\/genispec.com\/wp-content\/uploads\/2024\/02\/Inspection-de-batiment-commercial-ou-industriel-5.png","type":"image\/png"}],"author":"genispec","twitter_card":"summary_large_image","twitter_misc":{"Written by":"genispec","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/#article","isPartOf":{"@id":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/"},"author":{"name":"genispec","@id":"https:\/\/genispec.com\/en\/#\/schema\/person\/f940a395f00fe18856d620346ba7f319"},"headline":"How to prioritize facade repairs after a building inspection in Quebec ?","datePublished":"2026-10-19T23:23:31+00:00","dateModified":"2026-10-19T23:25:28+00:00","mainEntityOfPage":{"@id":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/"},"wordCount":2222,"publisher":{"@id":"https:\/\/genispec.com\/en\/#organization"},"image":{"@id":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/#primaryimage"},"thumbnailUrl":"https:\/\/genispec.com\/wp-content\/uploads\/2024\/02\/Inspection-de-batiment-commercial-ou-industriel-5.png","articleSection":["Facade","News"],"inLanguage":"en-CA"},{"@type":"WebPage","@id":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/","url":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/","name":"Prioritizing building facade repairs in Quebec - Our Guide | Genispec","isPartOf":{"@id":"https:\/\/genispec.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/#primaryimage"},"image":{"@id":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/#primaryimage"},"thumbnailUrl":"https:\/\/genispec.com\/wp-content\/uploads\/2024\/02\/Inspection-de-batiment-commercial-ou-industriel-5.png","datePublished":"2026-10-19T23:23:31+00:00","dateModified":"2026-10-19T23:25:28+00:00","description":"Learn how to prioritize exterior facade repairs following an inspection in accordance with Bill 122 : emergencies, timelines, quotes, and the condominium budget.","breadcrumb":{"@id":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/#breadcrumb"},"inLanguage":"en-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/"]}]},{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/#primaryimage","url":"https:\/\/genispec.com\/wp-content\/uploads\/2024\/02\/Inspection-de-batiment-commercial-ou-industriel-5.png","contentUrl":"https:\/\/genispec.com\/wp-content\/uploads\/2024\/02\/Inspection-de-batiment-commercial-ou-industriel-5.png","width":407,"height":305,"caption":"Commercial building inspection in downtown Montreal building"},{"@type":"BreadcrumbList","@id":"https:\/\/genispec.com\/en\/blog\/how-to-prioritize-facade-repairs-after-a-building-inspection-in-quebec\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/genispec.com\/en\/"},{"@type":"ListItem","position":2,"name":"How to prioritize facade repairs after a building inspection in Quebec ?"}]},{"@type":"WebSite","@id":"https:\/\/genispec.com\/en\/#website","url":"https:\/\/genispec.com\/en\/","name":"Genispec","description":"","publisher":{"@id":"https:\/\/genispec.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/genispec.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-CA"},{"@type":"Organization","@id":"https:\/\/genispec.com\/en\/#organization","name":"Genispec","url":"https:\/\/genispec.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/genispec.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/genispec.com\/wp-content\/uploads\/2018\/03\/optimized_with_description_FRENCH-e1522356210161.jpg","contentUrl":"https:\/\/genispec.com\/wp-content\/uploads\/2018\/03\/optimized_with_description_FRENCH-e1522356210161.jpg","width":225,"height":106,"caption":"Genispec"},"image":{"@id":"https:\/\/genispec.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Genispec\/","https:\/\/www.instagram.com\/genispec\/","https:\/\/www.linkedin.com\/in\/genispec-inspections-inc-971b7018\/","https:\/\/www.pagesjaunes.ca\/bus\/Quebec\/MONTREAL\/Genispec-Inspections-Inc\/100838448.html","https:\/\/www.youtube.com\/channel\/UC6V4DJsUvAGGOMjMfVG68LQ"]},{"@type":"Person","@id":"https:\/\/genispec.com\/en\/#\/schema\/person\/f940a395f00fe18856d620346ba7f319","name":"genispec","image":{"@type":"ImageObject","inLanguage":"en-CA","@id":"https:\/\/secure.gravatar.com\/avatar\/1246b52c179a3ee68d8491399f0c16985d81e2d247eb725dfb5d46a1000e328f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1246b52c179a3ee68d8491399f0c16985d81e2d247eb725dfb5d46a1000e328f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1246b52c179a3ee68d8491399f0c16985d81e2d247eb725dfb5d46a1000e328f?s=96&d=mm&r=g","caption":"genispec"},"description":"Genispec est une firme de g\u00e9nie-conseil compos\u00e9e d\u2019ing\u00e9nieurs en b\u00e2timent membres de l\u2019OIQ. Nous offrons des services sp\u00e9cialis\u00e9s en inspection des fa\u00e7ades et stationnements souterrains selon la Loi 122, en \u00e9tude de fonds de pr\u00e9voyance et carnet d\u2019entretien selon la Loi 16, ainsi qu\u2019en inspection de b\u00e2timents commerciaux, multi-logements, industriels et copropri\u00e9t\u00e9s. Nous r\u00e9alisons aussi des certificats d\u2019\u00e9tat d\u2019immeuble et des inspections de pr\u00e9-r\u00e9ception. Tous nos rapports sont valid\u00e9s par un ing\u00e9nieur qualifi\u00e9. Tous les articles publi\u00e9s sur notre site sont r\u00e9vis\u00e9s et approuv\u00e9s par un membre qualifi\u00e9 de notre \u00e9quipe, afin de garantir l\u2019exactitude technique de l\u2019information.","sameAs":["https:\/\/genispec.com"],"url":"https:\/\/genispec.com\/en\/blog\/author\/genispec\/"}]}},"_links":{"self":[{"href":"https:\/\/genispec.com\/en\/wp-json\/wp\/v2\/posts\/3739","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/genispec.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/genispec.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/genispec.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/genispec.com\/en\/wp-json\/wp\/v2\/comments?post=3739"}],"version-history":[{"count":5,"href":"https:\/\/genispec.com\/en\/wp-json\/wp\/v2\/posts\/3739\/revisions"}],"predecessor-version":[{"id":3744,"href":"https:\/\/genispec.com\/en\/wp-json\/wp\/v2\/posts\/3739\/revisions\/3744"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/genispec.com\/en\/wp-json\/wp\/v2\/media\/2838"}],"wp:attachment":[{"href":"https:\/\/genispec.com\/en\/wp-json\/wp\/v2\/media?parent=3739"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/genispec.com\/en\/wp-json\/wp\/v2\/categories?post=3739"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/genispec.com\/en\/wp-json\/wp\/v2\/tags?post=3739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}